UNCOUPLER: LGB 2x81x Harzer Five coupler
For the HSB five-couplers you have to make massive changes to the forerun / follower. How this looks we show here: Milling at the forerunner / follower Fully assembled uncoupler
For the HSB five-couplers you have to make massive changes to the forerun / follower. How this looks we show here: Milling at the forerunner / follower Fully assembled uncoupler
The steam locomotive 99 6001, or ballerina, can be modified relatively easily for the automatic decoupler. The forerunner and the follower are identical, so the adjustments are identical in the front and rear. In each case, a small plastic triangle is removed in front of the axle mount. It is important to keep about 0.5 cm of plastic in front of the axle, otherwise the axle will not find…
On the basic model of the Spreewald-Lokomotive it is necessary at the front as well as rear small rework on the rail clearing and the leading axle. At the rear, the snow plow is separated in the region of the decoupler into two components. The middle cut-out plastic piece is no longer required. The two snow plow halves on the right and left side are now mounted with the…
Here the changes for the installation in a Wismarer rail bus 2x65x Milled coupling holder Fully assembled decoupler
In this model, both the front and rear gearboxes are in the way. Vorne verfügt die Lok über einen relativ großen Getriebehalter. Dieser wird im Bereich des Entkupplerantriebes um gut 3 mm ausgefräst. The front part of the gearbox is also cut out in the middle section. The rear gearbox is completely cut off in the area of the automatic decoupler. Again, a small incision has to be made…
The decoupling unit can be mounted with moderate modifications to the Ge 2/4. Adaptations are necessary on the identical forerunner and follower. The small plastic triangle between axle and coupler mount must be removed completely. Subsequently, a wheel tire is drawn from the axis so that the axis can be separated from the plastic-molded part. Now the axle bearing can be split in the center on the clutch side,…
The Ge 4/4 II of LGB has to be adapted for the automatic decoupler only slightly. On both bogies, 15 mm must be cut off from the double plastic web. The automatic decoupler ensures safe operation. Here the changes for installation in a Ge 4/4 II 2x43x Milled coupling holder Fully assembled decoupler
The model of the Ge 4/4 III of the Rhaetian Railway has extensive modification for mounting the automatic decoupler. After the LGB coupling and the snow plow have been dismantled, the fastening thread for the snow plow screw is removed completely at the drawbar. Now, the central web is separated in the snowplow tip and in the region of the former fixing screw, the component is also cut out…
The automatic decoupler is also intended for the Rhaetian crocodile. In the crocodile, besides minor adjustments to the snow plow, it is primarily necessary to carry out subsequent work on the gearbox. The small noes-piece on the snow plow has to be removed so that the coupling hook can move freely downwards. In the case of gearboxes, the front web is first cut out in the gearbox. Then the…
With the Bernina rail car of the RhB, only a few small adjustments on the drawbar as well as on the snow plow are necessary for the assembly of the decoupler. The traction unit has an identical bogie at the front and at the rear, so the rework must be carried out on both sides. The snow plow cut is broadened to 1.6 cm. Thus, the hook of the…
Here the changes for installation in an electric locomotive BR 101 2x31x
On the G 3/4 steam locomotive of the Rhaetian Railway, the automatic uncoupler can be mounted both rear and front. At the rear, the decoupling unit can be mounted directly on the model without modifications. Small adjustments are necessary at the front axle. The plastic cover of the leading axle is completely removed in the center so that the axle is exposed on the front. In addition, the plastic…
At the Stainz, both front and rear adaptations are necessary. We recommend disassembling the gearbox as both sides must be adapted. First of all, the middle web of the through-going cylinder component is first cut out. In the next step, the front part of the gearbox is separated from the gearbox and cut out in the middle. In doing so, the latching lug, which was previously locked in the…
In the case of the plastic injection molding with the cylinders, small rework in the millimeter range is necessary. The component with the cylinders is hollow in the center and can be handled without any worries. After the appropriate adjustments, the decoupler can be installed at the front. At the rear, no adjustments are necessary, here the LGB coupler is exchanged directly against the automatic decoupler. Here 2 pictures…
Sorry, this entry is only available in German.
Sorry, this entry is only available in German.
As always the question arises, how to digitize a Ge 4/4 III with pantograph control, enclosed in the picture the necessary additional parts: 1 x Onboardadapter 8150701 1 x SUSI – LGB Onboard 4-wire 200mm 8312075 1 x Special Adapter cable 1 wire as shown in the picture. In case of need you can also cut the plug and connect the 1 cable as shown in the picture to…
Enclosed is the connection diagram of the Massoth LS decoder and the 10-pin DCC interface. LS_an_DCC_Schnittstelle.pdf
The maximum length of the bus cable depends on the cable used! For a non-shielded telephone cable, it is a maximum of 20m. For a CAT 5 or CAT 6 cable the length is almost unlimited. Whereupon a special bus amplifier is needed.
Connection of the Reverse loop module in an oval.